Skip to content

Remember Wang Suger Baby, Director of Zhejiang Jinhua Electric Power Supply District

  • by

requestId:686148ce22aaa1.86359071.

Sugar daddy

 
The “light” guarding the god of protection on high-pressure power lines
——Remember Wang Jianqin, Director of the Send Electrical Engineering Zone of Zhejiang Jinhua Electric Bureau

Hu Jianping Zhejiang Jinhua Electric Bureau


Recently, Zhejiang has once again ushered in a “touching” moment. The “Zhejiang Acclaim-200″ was released by Zhejiang Guangyi Group in cooperation with more than 30 media from inside and outside the province in cooperation with more than 30 media outlets from both inside and outside the province. href=”https://philippines-sugar.net/”>Sugar daddyThe 8 Most Influential Person Review of the Year” event officially started, and Wang Jianqin was the number one in Zhejiang’s power industry.
  Wang Jianqin, who was born in a 50-year-old technical school student, is a senior technician with military integrity, agricultural practice, and hunter police. He has been fighting for 33 years in the railway inspection and maintenance operation and power-treatment operation position. Since joining the task in September 1976, he has been a popular worker, embracing the feelings of ordinary people, and doing high-pressure electric wire protection tasks that seem popular but are indispensable to the public.
  Yonori’s Cliff of the Game of Survival and Death
  Since mid-January 2008, a snow and ice that had entered Zhejiang’s severe climate disaster history hit Jinhua. A total of 58 500 kV iron towers were formed, 500 kV contact lines between Zhejiang and Fujian, all the interruptions of the 500 kV power channel between Jinhua and Quzhou, Taizhou, Wenzhou and other places, and 9 500 kV lines between Jinhua and 14 500 kV lines between Jinhua and Quzhou. Jinhua Television is in danger! Zhejiang Electric Network is in crisis! 7 front-line command departments operated simultaneously, 10 teams from four provinces and three cities cooperated with each other, 19 land sites, nearly 100 construction sites were hit, and 25,000 troops were involved in the first line… “Fighting Zhejiang and fighting Jinhua”, a large-scale backbone of the main network was launched in Jinhua. In less than a week, Wang Pinay escort, Wang Manila escort‘s super-strength mission, led the industrial district employees, and from the 10,438 foundation towers, he specially toured the accurate status of the 58 foundation tower in the first time. From more than 3,500 kilometers of flat ground routes, the first time to checkOut the exact location of all the lines.
At 4:00 am on January 28, Wang Jianqin took the Jinhua Electric Bureau to send a 35-person team from Sugar daddy in the Electrical Engineering District to Niuta Mountain in Wuyi to repair the dual-sui line that supplies electricity from Jinhua to Sugar daddy. After more than 2 hours of rushing and 4 hours of digging through the mountain, I finally found the problem on the cliff at the top of the main peak of Niuta Mountain. At the angle of 70 degrees and the area is less than 3 square meters, the hard slope is slightly lower than 3 square meters. Put down the towel and fill in the form quickly so as not to delay the other party getting off work. At the entrance of the cliff with a temperature of less than 3 meters, a temperature as low as minus 5 degrees, and a wind force of nearly 6, Wang Jianqin braved his life-threatening from high-pressure online injury at any time, and died from “the first one to fall to the line fault point, and the first one to explore the sloped terrain of the cliff’s mouth. The first double-sentence line training that can be broken at any time”, in the examination of life and death, facing the bright and warm vision of Suichang City, Wang Jianqin and his team members chose to PK with time, PK with cliffs, PK with physical energy, and PK with themselves. Because he believed that in this competition of social responsibility in various industries, the champions would always run before the palm of their hands. From 6:30 am to LIU RECOVERY to RECOVERY RECOVERY ON LIVE IN LIFE TO RECOVERY IN THE LIFE OF LIFE, Wang Jianqin and others had spent a full 12 hours in the snowy and ice of Niuta Mountain. The book describes a popular line worker who is extremely proud of his high quality and fears his survival.
  Four and eight chapters Fallen ground iron tower
  On the New Year of 1999, Wang Jianqin, who was just surrounding the group table and preparing to eat a group of food, received an emergency repair call. A 220 kV line connecting Jinhua and Yiu found the emergency shortcomings. In the eyes of his wife Dai Suying, Wang Jianqin was early for the iron towers and rods on the mountain. He has become accustomed to going out early and going to bed late, and has long been confused about the concept of mission and rest. He has not been able to stay at home for a few days from the beginning of the year. “It seems that the cold iron tower is his wife. Every time he goes home, he complains of back pain, but when he receives a call from Shunxi, he has the opportunity to rest again. During the nap, she has a dream.”
  During the 2008 ice disaster, Wang Jianqin became one of the busiest people in the snowy ice in Niutao Mountain in Wuyi, Pan’an Qingmeili, and Yiwu Lengjian. At the earliest time, every day, we can arrange emergency patrol repair tasks at 3 o’clock in the morning. At the latest, we can eat the so-called “hot meals” with our team members. At the most, we have to use three mobile_phone batteries a day. At the busiest time, we have to take several hundred phone calls to contact the task a day. At the most tired time, we have to climb more than 6 hours a day. We have to make 4 cars.How many hours of flat road, then 2 hours of cliff repair, and finally you have to attend a meeting of more than an hour, at the very end Sugar babyWhen it is difficult, you have to set up several ten small tour teams a day. When you are most uneasy, you have to receive dozens of bad news messages a day. When you are most embarrassed, you will face the training tasks and transfer the latest tours in a unified time. There are more than ten tasks that burn eyebrows, including line results, coordination of repair resources, participation in emergency emergency meetings, point repair plans, and implementation of safety measures. The most inconsistent time is to want employees to rest on the one hand, and to continue repairing on the other hand.
  Six and three tips, Intelligent Line Iron Army
  The disaster of ice and snow in 2008 caused the 110-500 kV transmission lines of Jinhua Network to continue to cause ice flashes, slams, and towers, which were severely affected, which formed a serious threat to the safe and stable operation of Jinhua and Zhejiang Network. As a Communist Party member and leader in the industrial area, he set an example and led the way in this battle to fight against ice and disaster and ensure electricity supply, and paid his own strength in this battle to fight against ice and disaster and electricity supply.
  First, point forward and move quickly to ensure that you can grasp the disaster situation at the first time and provide first-hand information for anti-disaster disaster. Faced with the sudden disaster, as the chief of the industrial district director to fight disaster, he can be busy but not troublesome, and quickly start the emergency rescue mechanism to ensure that all tasks are carried out in an orderly manner. In order to grasp the disaster in time, starting from January 16, the daily mission time has reached 13 to 1Sugar baby for 4 hours, without a day of rest; at the same time, the mechanism perfect emergency guarantee was perfected, and the early-collision meeting system was prepared, and the relevant meeting energy of the Internet, Huadong, provincial companies and bureaus was conveyed in time, and tasks and technical briefings were assigned on the same day.
  The second is to set an example and lead by example, to ensure that the disaster is fought in the first time, and to resume safe operation in every second. Being honest and meticulous in your mission, using the code to do the most important task time. He participated in the repair of Anjian 1699 line 6#~10# file breaking and 10 base line distortion main material replacement, 3600 meters of the 3600-meter ground conductor, 2Q23 line 22#~23# ground line repair, 2Q24 line 27# tower left ground line distortion and swaying and processing of 2389 line 17 file guide line treatment, and enjoy the fun and fight with the working area workers. The 19-20 line of Shayuan Line 1649 was repaired. After Wang Jianqin proposed the new plan, he was 13 earlier than the original plan.Tiantong Electric.
  The third is to coordinate and do your best to organize the Jinhua Internet main network to conduct a good experience of the fight. According to the request of the provincial and bureau departments, in order to ensure the successful implementation of the main network’s repair and attack, we have taken the initiative to strengthen our contact and cooperation with each repair construction unit, and will conduct step-by-step inspections in seconds. We adhere to the principle of no connection between construction and acceptance, so as to ensure that the repair lines are reliable.
  Ten Snakes and One Sheath, tempering the four “special” quality
  One is that you can enjoy your pleasure – “You can only endure the hardships and become a lineman”. In the future when the local disk resources are increasingly TC:

發佈留言

發佈留言必須填寫的電子郵件地址不會公開。 必填欄位標示為 *